Long Island Homeworks, general contractor in Hicksville NY
Roslyn Long Island
Roslyn, Nassau County

Dormers and home additions in Roslyn.

Long Island Homeworks has built dormers, additions, and new homes in a North Shore community with period homes and 1950s-60s infill where dormer work usually means matching original detail on a period roofline.

Serving Roslyn since 2007
Nassau + town permits handled
4.9★ / 243 reviews

Walk-through in Roslyn

The owner visits personally — no travel fees in Nassau.

No pressure. We call back within 4 business hours to talk through your project. Prefer to talk now? (631) 641-5491

Licensed & Insured
Nassau + Suffolk
4.9-Star Average Rating
243+ reviews
618+ Projects
Since 2007
BBB A+ Accredited
No complaints on file

Building in Roslyn, Nassau County

Roslyn covers a few different places. The Village of Roslyn, Roslyn Heights, Roslyn Estates and Roslyn Harbor all share the name, and depending on where your house sits, the permit goes to a village building department or to the Town of North Hempstead. Confirm that first.

The housing ranges from older homes near the village center to 1950s and 60s Capes, ranches and colonials in Roslyn Heights. Older houses often need framing upgrades before a dormer can go on, and the new roofline should look like it was always there. On the post-war houses, shed dormers and rear additions are the usual way to add bedrooms and a bigger kitchen. Hilly lots can complicate the foundation for an addition, so a survey and a site visit come early.

Common Questions

Frequently Asked Questions About Building in Roslyn

Do you build in Roslyn?

Yes — Roslyn is firmly inside our service area. We hold Nassau County HIC #198901 and pull the applicable town-level permit for Roslyn jobs. No travel fees within Nassau.

Do I need a permit for a dormer or addition in Roslyn?

Yes, for almost any structural dormer or addition in Roslyn. Our permit coordinator manages the filing end-to-end — from drawings through inspection sign-off. Permit costs are itemized in the estimate, not a surprise.

How long does an addition take in Roslyn?

Design and permitting: 2–4 months. A typical dormer runs 6–9 weeks to completion after permit issuance. A second-story addition is 4–6 months. New construction runs 12–16 months. We build Gantt charts at the scoping visit.

Can you work on older Roslyn homes?

Absolutely — it's a lot of what we do. Pre-war colonials, mid-century Capes, and ranches all benefit from additions. We match existing soffits, trim profiles, and rooflines carefully. The owner reviews every heritage-match detail personally.

Ready to build in Roslyn?

Free on-site consultation. Permits handled. No travel fee in Nassau County.

Mon–Fri, 7am to 6pm | Saturdays by appointment · Call or text anytime

(631) 641-5491