Long Island Homeworks, general contractor in Hicksville NY
Flower Hill Long Island
Flower Hill, Nassau County

General contractor in Flower Hill.

Long Island Homeworks has built dormers, additions, and new homes in a North Shore village where older colonials sit alongside mid-century ranches where second-story work is common on the smaller original houses.

Serving Flower Hill since 2007
Nassau + town permits handled
4.9★ / 243 reviews

Walk-through in Flower Hill

The owner visits personally — no travel fees in Nassau.

No pressure. We call back within 4 business hours to talk through your project. Prefer to talk now? (631) 641-5491

Licensed & Insured
Nassau + Suffolk
4.9-Star Average Rating
243+ reviews
618+ Projects
Since 2007
BBB A+ Accredited
No complaints on file

Building in Flower Hill, Nassau County

Flower Hill is an incorporated village in the Town of North Hempstead, next to Manhasset and Port Washington, with its own building department. The homes are mostly larger colonials, Tudors and custom houses on bigger lots, plus some post-war Capes and ranches.

General contracting work here tends to be bigger in scope: second-story additions, rear additions with new kitchens and family rooms, whole-house renovations and the occasional tear-down and rebuild. Dormers still make sense on the Capes. With a village building department, plans are reviewed against the village's own zoning code, so setbacks, height and lot coverage are worth confirming before design. Larger projects may also need survey and drainage work as part of the permit set.

Common Questions

Frequently Asked Questions About Building in Flower Hill

Do you build in Flower Hill?

Yes — Flower Hill is firmly inside our service area. We hold Nassau County HIC #198901 and pull the applicable town-level permit for Flower Hill jobs. No travel fees within Nassau.

Do I need a permit for a dormer or addition in Flower Hill?

Yes, for almost any structural dormer or addition in Flower Hill. Our permit coordinator manages the filing end-to-end — from drawings through inspection sign-off. Permit costs are itemized in the estimate, not a surprise.

How long does an addition take in Flower Hill?

Design and permitting: 2–4 months. A typical dormer runs 6–9 weeks to completion after permit issuance. A second-story addition is 4–6 months. New construction runs 12–16 months. We build Gantt charts at the scoping visit.

Can you work on older Flower Hill homes?

Absolutely — it's a lot of what we do. Pre-war colonials, mid-century Capes, and ranches all benefit from additions. We match existing soffits, trim profiles, and rooflines carefully. The owner reviews every heritage-match detail personally.

Ready to build in Flower Hill?

Free on-site consultation. Permits handled. No travel fee in Nassau County.

Mon–Fri, 7am to 6pm | Saturdays by appointment · Call or text anytime

(631) 641-5491