
Home builders in West Islip.
Long Island Homeworks has built dormers, additions, and new homes in a South Shore hamlet of 1950s-60s Capes and ranches on compact lots where second-story additions are the usual answer to a small footprint.
Walk-through in West Islip
The owner or our new build superintendent visits personally — East End coverage included.
General Contractor in West Islip, Suffolk County
West Islip is a South Shore hamlet in the Town of Babylon, so permits go to the Town of Babylon building department. Most of the housing is from the 1950s and 60s: Capes, ranches and high ranches, with larger homes on the canals and the bay south of Montauk Highway.
Inland, the common projects are shed dormers on Capes and second stories on ranches, since lots are compact and building up keeps the yard. Near the water, start with your flood zone. A large project in a FEMA flood zone can be treated as a substantial improvement, which brings the whole house up to flood standards. Knowing that early keeps the design realistic.
Dormers, additions & custom homes
Dormer Additions
Full shed and Cape-style dormers in West Islip. Town permit handled, framed and watertight same day.
Learn moreHome Additions
Second stories, rear builds, primary suites, in-law suites, kitchen extensions in West Islip.
Learn moreNew Home Construction
Ground-up custom homes and tear-down rebuilds in West Islip. Fixed-price contracts.
Learn moreHome Extensions
Single-story bump-outs and rear extensions that add a room on the ground floor of a West Islip house.
Learn moreGarage Conversions
An attached West Islip garage turned into a bedroom, office or family room inside the existing walls.
Learn moreMother-Daughter Conversions
A second living space for family in West Islip, planned around what the local zoning allows.
Learn moreDormers and additions near West Islip
Frequently Asked Questions About Building in West Islip
Do you build in West Islip?
Yes — we hold Suffolk County license HI-69024 and are active in West Islip. We pull every applicable town-level permit (Huntington, Smithtown, Babylon, Brookhaven, Islip, Southampton, East Hampton, etc.).
Do I need a permit for a dormer or addition in West Islip?
Yes — nearly every structural addition in Suffolk requires one. Our permit coordinator handles the filing from drawings through inspection close-out. All permit costs are itemized in the estimate.
How long does an addition take in West Islip?
Design and permit filing: 2–4 months. Dormer: 6–9 weeks to finish after permit issue. Second-story addition: 4–6 months. Custom new construction: 12–16 months. You get a Gantt chart at your first scoping visit.
Do you work in the Hamptons?
Yes — East End new construction is a growing share of our book. We're familiar with the Southampton and East Hampton architectural review boards, CCA coastal requirements, and FEMA flood-zone builds.
Ready to build in West Islip?
Free on-site consultation. Permits handled. East End coverage for new construction.
Mon–Fri, 7am to 6pm | Saturdays by appointment · Call or text anytime
