
Home builders in Kings Park.
Long Island Homeworks has built dormers, additions, and new homes in a central Long Island hamlet of post-war ranches and split-levels where shed dormers and second-story additions are the standard way to add space.
Walk-through in Kings Park
The owner or our new build superintendent visits personally — East End coverage included.
General Contractor in Kings Park, Suffolk County
Kings Park is a North Shore hamlet in the Town of Smithtown, and permits go through the Town of Smithtown. The houses are a mix of Capes, ranches, colonials and high ranches, most built after the war, with some older homes closer to the water.
Capes here are the classic dormer candidates. A full shed dormer across the rear roof adds bedrooms and a bathroom without touching the footprint. Ranches often get a second story or a rear addition for a bigger kitchen and family room. Colonials usually grow out the back. The town reviews height, setbacks and lot coverage, so it's worth knowing those numbers for your lot before anyone starts drawing.
Dormers, additions & custom homes
Dormer Additions
Full shed and Cape-style dormers in Kings Park. Town permit handled, framed and watertight same day.
Learn moreHome Additions
Second stories, rear builds, primary suites, in-law suites, kitchen extensions in Kings Park.
Learn moreNew Home Construction
Ground-up custom homes and tear-down rebuilds in Kings Park. Fixed-price contracts.
Learn moreHome Extensions
Single-story bump-outs and rear extensions that add a room on the ground floor of a Kings Park house.
Learn moreGarage Conversions
An attached Kings Park garage turned into a bedroom, office or family room inside the existing walls.
Learn moreMother-Daughter Conversions
A second living space for family in Kings Park, planned around what the local zoning allows.
Learn moreDormers and additions near Kings Park
Frequently Asked Questions About Building in Kings Park
Do you build in Kings Park?
Yes — we hold Suffolk County license HI-69024 and are active in Kings Park. We pull every applicable town-level permit (Huntington, Smithtown, Babylon, Brookhaven, Islip, Southampton, East Hampton, etc.).
Do I need a permit for a dormer or addition in Kings Park?
Yes — nearly every structural addition in Suffolk requires one. Our permit coordinator handles the filing from drawings through inspection close-out. All permit costs are itemized in the estimate.
How long does an addition take in Kings Park?
Design and permit filing: 2–4 months. Dormer: 6–9 weeks to finish after permit issue. Second-story addition: 4–6 months. Custom new construction: 12–16 months. You get a Gantt chart at your first scoping visit.
Do you work in the Hamptons?
Yes — East End new construction is a growing share of our book. We're familiar with the Southampton and East Hampton architectural review boards, CCA coastal requirements, and FEMA flood-zone builds.
Ready to build in Kings Park?
Free on-site consultation. Permits handled. East End coverage for new construction.
Mon–Fri, 7am to 6pm | Saturdays by appointment · Call or text anytime
