Long Island Homeworks, general contractor in Hicksville NY
Holbrook Long Island
Holbrook, Suffolk County

Dormers and home additions in Holbrook.

Long Island Homeworks has built dormers, additions, and new homes in an inland community built out with Levitt-era Capes and 1960s splits where rear extensions and dormers are the common expansions.

Serving Holbrook since 2007
Suffolk + town permits handled
4.9★ / 243 reviews

Walk-through in Holbrook

The owner or our new build superintendent visits personally — East End coverage included.

No pressure. We call back within 4 business hours to talk through your project. Prefer to talk now? (631) 641-5491

Licensed & Insured
Nassau + Suffolk
4.9-Star Average Rating
243+ reviews
618+ Projects
Since 2007
BBB A+ Accredited
No complaints on file

General Contractor in Holbrook, Suffolk County

Holbrook straddles two towns. Part of it is in the Town of Islip and part is in the Town of Brookhaven, so the first step on any dormer or addition is confirming which building department your address files with. The housing is mostly Capes, high ranches and split-levels, much of it built from the 1960s on, plus some newer colonials.

On the Capes, a shed dormer is the most common way to add bedrooms and a full bath upstairs. High ranches often get a kitchen extension or a bump-out, and splits can take an addition over the garage. Setbacks and lot coverage depend on the town and the zoning district, so those numbers come before the design.

Common Questions

Frequently Asked Questions About Building in Holbrook

Do you build in Holbrook?

Yes — we hold Suffolk County license HI-69024 and are active in Holbrook. We pull every applicable town-level permit (Huntington, Smithtown, Babylon, Brookhaven, Islip, Southampton, East Hampton, etc.).

Do I need a permit for a dormer or addition in Holbrook?

Yes — nearly every structural addition in Suffolk requires one. Our permit coordinator handles the filing from drawings through inspection close-out. All permit costs are itemized in the estimate.

How long does an addition take in Holbrook?

Design and permit filing: 2–4 months. Dormer: 6–9 weeks to finish after permit issue. Second-story addition: 4–6 months. Custom new construction: 12–16 months. You get a Gantt chart at your first scoping visit.

Do you work in the Hamptons?

Yes — East End new construction is a growing share of our book. We're familiar with the Southampton and East Hampton architectural review boards, CCA coastal requirements, and FEMA flood-zone builds.

Ready to build in Holbrook?

Free on-site consultation. Permits handled. East End coverage for new construction.

Mon–Fri, 7am to 6pm | Saturdays by appointment · Call or text anytime

(631) 641-5491