
Home builders in Long Beach.
Long Island Homeworks has built dormers, additions, and new homes in a South Shore community where post-war Capes and high-ranches dominate where shed dormers on Capes are the most common way to add bedrooms.
Walk-through in Long Beach
The owner visits personally — no travel fees in Nassau.
Building in Long Beach, Nassau County
Long Beach is its own city on a barrier island, so building permits go through the City of Long Beach, not a town. The housing is a mix of older bungalows, two-story homes and newer rebuilds on narrow lots, and much of the island flooded during Hurricane Sandy in 2012.
Flood rules drive most additions here. A lot of the city is in a FEMA flood zone, and a project that's large compared with the value of the house can be treated as a substantial improvement, which brings the whole house up to current flood standards. That's why many Long Beach owners weigh a rebuild against an addition. Start with your flood zone and an elevation certificate, then decide between building up, building out, or starting over.
Dormers, additions & custom homes
Dormer Additions
Full shed and Cape-style dormers in Long Beach. Town permit handled, framed and watertight same day.
Learn moreHome Additions
Second stories, rear builds, primary suites, in-law suites, kitchen extensions in Long Beach.
Learn moreNew Home Construction
Ground-up custom homes and tear-down rebuilds in Long Beach. Fixed-price contracts.
Learn moreHome Extensions
Single-story bump-outs and rear extensions that add a room on the ground floor of a Long Beach house.
Learn moreGarage Conversions
An attached Long Beach garage turned into a bedroom, office or family room inside the existing walls.
Learn moreMother-Daughter Conversions
A second living space for family in Long Beach, planned around what the local zoning allows.
Learn moreDormers and additions near Long Beach
Frequently Asked Questions About Building in Long Beach
Do you build in Long Beach?
Yes — Long Beach is firmly inside our service area. We hold Nassau County HIC #198901 and pull the applicable town-level permit for Long Beach jobs. No travel fees within Nassau.
Do I need a permit for a dormer or addition in Long Beach?
Yes, for almost any structural dormer or addition in Long Beach. Our permit coordinator manages the filing end-to-end — from drawings through inspection sign-off. Permit costs are itemized in the estimate, not a surprise.
How long does an addition take in Long Beach?
Design and permitting: 2–4 months. A typical dormer runs 6–9 weeks to completion after permit issuance. A second-story addition is 4–6 months. New construction runs 12–16 months. We build Gantt charts at the scoping visit.
Can you work on older Long Beach homes?
Absolutely — it's a lot of what we do. Pre-war colonials, mid-century Capes, and ranches all benefit from additions. We match existing soffits, trim profiles, and rooflines carefully. The owner reviews every heritage-match detail personally.
Ready to build in Long Beach?
Free on-site consultation. Permits handled. No travel fee in Nassau County.
Mon–Fri, 7am to 6pm | Saturdays by appointment · Call or text anytime
