Long Island Homeworks, general contractor in Hicksville NY
Levittown Long Island
Levittown, Nassau County

Home builders in Levittown.

Long Island Homeworks has built dormers, additions, and new homes in an iconic planned community with thousands of Capes prime for shed-dormer expansions and second stories.

Serving Levittown since 2007
Nassau + town permits handled
4.9★ / 243 reviews

Walk-through in Levittown

The owner visits personally — no travel fees in Nassau.

No pressure. We call back within 4 business hours to talk through your project. Prefer to talk now? (631) 641-5491

Licensed & Insured
Nassau + Suffolk
4.9-Star Average Rating
243+ reviews
618+ Projects
Since 2007
BBB A+ Accredited
No complaints on file

Building in Levittown, Nassau County

Levittown was built fast. Levitt and Sons put up thousands of Capes and ranches here between 1947 and 1951, on small, evenly sized lots. Seventy-plus years later almost no two look alike, because owners have been adding on ever since.

That history shapes what's possible on your house. A lot of Levittown Capes already have a small dormer, so the next step is often a full-width shed dormer or taking the second floor all the way up. Ranches tend to grow out the back or go up a full story. Most of Levittown is in the Town of Hempstead, with a small part in the Town of Oyster Bay, so the first thing to pin down is which building department your address files with. Setbacks and lot coverage on those small lots decide how far back an addition can go, which is why so many Levittown projects build up instead of out.

Common Questions

Frequently Asked Questions About Building in Levittown

Do you build in Levittown?

Yes — Levittown is firmly inside our service area. We hold Nassau County HIC #198901 and pull the applicable town-level permit for Levittown jobs. No travel fees within Nassau.

Do I need a permit for a dormer or addition in Levittown?

Yes, for almost any structural dormer or addition in Levittown. Our permit coordinator manages the filing end-to-end — from drawings through inspection sign-off. Permit costs are itemized in the estimate, not a surprise.

How long does an addition take in Levittown?

Design and permitting: 2–4 months. A typical dormer runs 6–9 weeks to completion after permit issuance. A second-story addition is 4–6 months. New construction runs 12–16 months. We build Gantt charts at the scoping visit.

Can you work on older Levittown homes?

Absolutely — it's a lot of what we do. Pre-war colonials, mid-century Capes, and ranches all benefit from additions. We match existing soffits, trim profiles, and rooflines carefully. The owner reviews every heritage-match detail personally.

Ready to build in Levittown?

Free on-site consultation. Permits handled. No travel fee in Nassau County.

Mon–Fri, 7am to 6pm | Saturdays by appointment · Call or text anytime

(631) 641-5491