
Home builders in Jericho.
Long Island Homeworks has built dormers, additions, and new homes in a North Shore community of pre-war colonials and Tudors with post-war ranches behind them where additions have to respect the existing architecture to look right.
Walk-through in Jericho
The owner visits personally — no travel fees in Nassau.
Building in Jericho, Nassau County
Jericho is a hamlet in the Town of Oyster Bay. A lot of the housing is from the 1950s and 60s, mostly ranches, split-levels and colonials, many on larger lots than you see on the South Shore.
The bigger lots give you more options. Ranches here often get a full second story or a large rear addition, and split-levels can take an addition over the garage wing or a rebuilt upper level. Some owners decide the house isn't worth adding to and go with a tear-down and new home instead. The Town of Oyster Bay reviews height, setbacks and lot coverage, so those numbers set the size of the project before design starts.
Dormers, additions & custom homes
Dormer Additions
Full shed and Cape-style dormers in Jericho. Town permit handled, framed and watertight same day.
Learn moreHome Additions
Second stories, rear builds, primary suites, in-law suites, kitchen extensions in Jericho.
Learn moreNew Home Construction
Ground-up custom homes and tear-down rebuilds in Jericho. Fixed-price contracts.
Learn moreHome Extensions
Single-story bump-outs and rear extensions that add a room on the ground floor of a Jericho house.
Learn moreGarage Conversions
An attached Jericho garage turned into a bedroom, office or family room inside the existing walls.
Learn moreMother-Daughter Conversions
A second living space for family in Jericho, planned around what the local zoning allows.
Learn moreDormers and additions near Jericho
Frequently Asked Questions About Building in Jericho
Do you build in Jericho?
Yes — Jericho is firmly inside our service area. We hold Nassau County HIC #198901 and pull the applicable town-level permit for Jericho jobs. No travel fees within Nassau.
Do I need a permit for a dormer or addition in Jericho?
Yes, for almost any structural dormer or addition in Jericho. Our permit coordinator manages the filing end-to-end — from drawings through inspection sign-off. Permit costs are itemized in the estimate, not a surprise.
How long does an addition take in Jericho?
Design and permitting: 2–4 months. A typical dormer runs 6–9 weeks to completion after permit issuance. A second-story addition is 4–6 months. New construction runs 12–16 months. We build Gantt charts at the scoping visit.
Can you work on older Jericho homes?
Absolutely — it's a lot of what we do. Pre-war colonials, mid-century Capes, and ranches all benefit from additions. We match existing soffits, trim profiles, and rooflines carefully. The owner reviews every heritage-match detail personally.
Ready to build in Jericho?
Free on-site consultation. Permits handled. No travel fee in Nassau County.
Mon–Fri, 7am to 6pm | Saturdays by appointment · Call or text anytime
